Business Scale$94M+Average TurnoverMix of small and medium, large
?
Business Size232Average number of employeesMix of small and medium, large
?
Aboriginal Owned8
?
Regional DiversityAdelaide City Council, Adelaide Hills Council, Campbelltown City Council, City Of Burnside, City Of Charles Sturt, City Of Holdfast Bay, City Of Mitcham, City Of Mount Gambier, City Of Onkaparinga, City Of Playford, City Of Port Adelaide Enfield, City Of Port Lincoln, City Of Salisbury, City Of Unley, City Of West Torrens, Clare And Gilbert Valleys Council, Copper Coast Council, Light Regional Council, Mid Murray Council, Mount Barker District Council, Municipal Council Of Roxby Downs, Port Augusta City Council, Port Pirie Regional Council, Renmark Paringa Council, The Berri Barmera Council, The City Of Norwood Payneham And St Peters, The Corporation Of The City Of Whyalla, The Dc Of Ceduna, The Dc Of Cleve, The Dc Of Coober Pedy, The Dc Of Loxton Waikerie, The Dc Of Mount Remarkable, The Flinders Ranges Council, The Rural City Of Murray Bridge, Town Of Gawler, Wattle Range Council
?
ComplianceAS/NZS ISO 9001:2015, ISO 14001:2015, Building Code 2013, ISO 45001:2018, AS/NZS 4801:2001, Building Code 2016, CCF Management Code, ISO 14001:2004, AS/NZS ISO 9001:2008, ISO 9001:2008
?
Other Packages of Works
AsphaltSupply, install and warrant concrete pavements, asphalt road works and ancillary works across the construction zones.
23
$2B+avg
3K+avg
Buildings/Visitor CentresConstruction of fixed infrastructure such as buildings, sheds and warehouses.
57
$92M+avg
198avg
Camp Facility ServicesCamp facility services include, housekeeping, maintenance, communication, catering and dining, utilities, recreation, amenities and medical.
16
$1B+avg
5K+avg
Concrete Lay/PlacementPlacement of concrete on demand to all specified areas on site including footpaths, kerbing, concrete slabs, footings, bindings, piles and retaining walls.
60
$75M+avg
175avg
Concrete SupplySupply of concrete
18
$619M+avg
2K+avg
EarthworksExcavation of areas to construct building pads and other retaining or earth structures.
90
$94M+avg
232avg
Engineering and DesignCivil engineering and design including roads, water and wastewater systems, bridges, transportation systems, coastal and marine structures.
55
$340M+avg
3K+avg
FencingSupply and install fixed and temporary site fencing including chain-link fencing and gates, security fencing and gates, separation and isolation screens to plant rooms.
71
$102M+avg
178avg
FormworkDesign, supply, install, hire, strip and remove formwork and ancillary works to all specified areas on site. Formwork required for footpaths/kerbing, concrete slabs, blinding, footings and retaining walls.
46
$106M+avg
393avg
Fuel SupplySupply of fuel to site locations.
15
$2B+avg
2K+avg
Geological SamplingGeological sampling includes the collection and analysis of geological samples to assess the feasibility, potential, and environmental impacts of projects.
36
$200M+avg
4K+avg
Hydraulic ServicesManufacture, supply, install, certify and warrant hydraulic services together with associated works to all buildings in construction zones. Scope also includes portable water reticulation, drainage to pumping stations and sewer pressure mains from station to termination point.
26
$73M+avg
274avg
Labour HireLabour hire for civil and building projects.
80
$192M+avg
3K+avg
Lifting Services - CranesProvision of mobile cranes, including rigging services.
61
$83M+avg
977avg
Line MarkingLine marking for traffic management, civil works, car parks and sports courts as well as marking of stencils, disability logos and raised retro-reflective and pavement markers.
12
$70M+avg
751avg
Mechanical Services - Machine Maintenance and RepairOnsite and offsite heavy plant and machinery service or repair.
59
$145M+avg
5K+avg
Mechanical Services - HVAC, Lagging and Structural ComponentsInstall, maintenance and operation of HVAC (heating, ventilation and air conditioning) as well as lagging (insulation and protective covering applied to pipes, ducts and equipment) and structural services (structural analysis, retrofitting, modifications and safety compliance).
68
$88M+avg
9K+avg
Medical ServicesMedical services provided to the construction industry including pre-employment medical checks, occupational health and safety programs, injury and illness management, health and safety training and drug and alcohol testing.
29
$56M+avg
561avg
On-Shore Wind Turbine Civil and MechanicalSpecialist civil and mechanical services providers for on-shore wind turbines.
8
$49M+avg
22K+avg
Precast ConcreteManufacture and deliver specification compliant precast concrete components, including products for drainage work, site casting beds, propping and footings, plates and dowels etc.
39
$629M+avg
2K+avg
Quarry ProductsSupply of rock, sand, aggregate and other fill materials.
30
$328M+avg
2K+avg
Reinforcing Steel FixReinforcing steel fix for all diameters include scheduling, marking plans, cutting and bending, stock and cut lengths, stirrups, spirals, mesh, tie wire, couplers, and dowels.
34
$149M+avg
510avg
Scaffolding ServicesSupply scaffolding including tube and clip, kwik stage, aluminium, and mobile scaffolds.
26
$995M+avg
3K+avg
Security - Patrol ServicesProvision of security guards, security officers and patrol vehicles to secure site facilities, including construction sites, access roads and accommodation during construction.
47
$86M+avg
2K+avg
SignageSupply and installation of regulatory signs, warning signs, marker signs, guide and informational signs.
24
$508M+avg
19K+avg
SurveyorDigital terrain surveys, ongoing site surveys and technical cadastral surveying to buildings within construction zones and general external works.
58
$52M+avg
5K+avg
TelecomsInstallation of telecommunications infrastructure to monitor facilities.
41
$1B+avg
4K+avg
Temporary Buildings and Remote CampsInstallation of temporary facilities including offices, crib rooms, accommodation, toilet blocks and remote camps.
16
$150M+avg
941avg
Traffic ManagementManagement of all incoming-outgoing traffic, traffic impact statements and traffic management plans.
50
$615M+avg
2K+avg
Transport/FreightTransport of materials to site.
134
$1B+avg
7K+avg
Waste ManagementWorks include disposal of both solid and liquid wastes (hazardous and non-hazardous), handling, transport, reuse, recycling, treatment and final disposal of various wastes generated by project activities.
30
$998M+avg
5K+avg
WaterSupply and cartage of bulk water.
33
$55M+avg
146avg
Wet and Dry HireWet Hire: hire of equipment or machinery with an operator or Dry Hire: hire of equipment and machinery.